Location: 5212North Bay Road, Miami Beach, FL 33140 US
Client: Confidential
Project Description:
Design & Engineering Team:
Construction Team:
Location: 174 Camden Dr, Bal Harbour, FL 33154 US
Client: Confidential
Project Description:
Design & Engineering Team:
Construction Team:
Construction Highlights:
Location: 5212North Bay Road, Miami Beach, FL 33140 US
Client: Confidential
Project Description: This new custom-built, two-story single-family residence integrates luxury living with architectural elegance and thoughtful spatial planning. The property includes an attached garage and a detached fitness pavilion, replacing a pre-1942 structure. The design incorporates a 4-foot height waiver and courtyard/open space waiver to maximize usability and aesthetic value.
Design &Engineering Team:
Construction Team:
Construction Highlights:
Location: 201 Diplomat Parkway Hallandale Beach, FL 33009 US
Client: Confidential
Project Description:
Structural Precision & Engineering: The backbone of Shell Bay utilizes advanced Post-Tensioned (PT) structural systems for both the towering residential floors and the expansive parking facility, ensuring maximum structural efficiency and open architectural spans.
Vertical Zoning & Programmatic Distribution
Technical Summary
Design & Engineering Team:
Construction Team:
Location: 4881 Griffin Road, Davie, FL 33314
Client: Confidential
Project Description: Tequesta Reserve is a six-story multifamily residential development designed to provide modern urban living with structural durability and efficiency. The project features 76 residential units and 122 parking spaces, adhering to Construction Type III (FBC 602.3) and reaching a total building height of over 60 feet A.F.F. (to roof).
Design & Engineering Team
Construction Team
Construction Highlights
Location: 4545 N. Federal Hwy., Fort Lauderdale, FL 33308
Client: The Jim Moran Foundation
Project Description: This five-story facility stands as a landmark of modern institutional architecture in Fort Lauderdale. Designed to meet the highest standards of durability and sustainability, the building earned a LEED Gold Certification and was engineered to withstand Category 5 hurricanes.
Design & Engineering Team
Construction Team
Core & Shell Project Managers
Construction Highlights
References
The Jim Moran Foundation Headquarters: https://www.archpaper.com/2023/06/hastings-headquarters-jim-moran-foundation-breaks-ground-fort-lauderdale/